The Bikongor Hydroelectric Project uses the Sewa River near Najaiama Sewafe in Kenema District, Sierra Leone. The dam stands 18 meters high, annual rainfall averages 2,500 mm. The facility includes a concrete overflow dam and short non-overflow sections. The project involves open canal, Forebay and surface powerhouse. Designed capacity is 150MW.
The scope of BHEC includes complete Design Engineering and Project Management Services.
080-26753462 / 080-26740793
projects@bhec.in
#80D, 12th Cross, Avalahalli Extention, Girirnagar III phase, Bengaluru - 560 085
© Copyright BHEC 2025 . All right reserved.