ANS-I Hydro Electric Project (AHEP) on river Ans, near the village Nandoli in Reasi District, J&K belongs to M/s Pioner JK Hydropower Limited for implementation on BOOT basis.
The powerhouse is located on the Right bank of the river with Mahore as the nearest town. The project proposes to utilize the flows in river Ans after its confluence with Gulabgarh Nallah and the drop in the riverbed elevations along its course.
The proposed scheme 3 units of 16666.67 kW capacity each with a total installation of 50.00 MW.
The Consultants, M/s. Bangalore Hydro Engineers and Consultants Pvt. Ltd., engaged by the Company for the preparation of DPR.
080-26753462 / 080-26740793
projects@bhec.in
#80D, 12th Cross, Avalahalli Extention, Girirnagar III phase, Bengaluru - 560 085
© Copyright BHEC 2025 . All right reserved.