Neogal HEP
"COMPLETED DETAILED ENGINEERING SERVICES"
1. | Project Location | Palampur, Kangra District, Himachal pradesh |
2. | Gross Head | 456.00m |
3. | Type of Scheme | Run of the River |
4. | Installed capacity | 2 x 7.5 MW = 15 MW |
5. | Type of Turbine | Pelton Wheel |
6. | Components | Weir, Head Race Tunnel, De silting Basin, Adits, Surge Shaft, Penstock, Power House. |
7 | Status | Commissioned |
8 | Owner | M/s Om Power Corporation Limited., |