Panan    HEP

"ON GOING DETAILED ENGINEERING SERVICES"

1. Project Location North Sikkim, Sikkim
2. Gross Head 361.4 m
3. Type of Scheme Run of   the River
4. Installed capacity 4 x 75 = 300 MW
5. Type of Turbine Vertical  Francis
6. Components Dam, Intake, Under ground Desilting Basin, Silt flushing tunnel, HRT (9.3 km), under ground Surge shaft, Wall chamber, Penstock Tunnel, Penstock, Surface Power House, Tail Race Pool, 400 kV GIS building
7 Status Yet to begin
8 Owner Himagiri Hydro Energy Pvt. Ltd.,

Projects Photos